Overview: This program item is used to add system event information to scheduled test reports. Test reports are set up as scheduled events in the Skeds section of the program.
Issue
Default: No
Selections: Yes/No
This program item is used to add system event information to scheduled test reports. Test reports are set up as scheduled events in the Skeds section of the program.
WARNING: This parameter is related only to Sked Function Code 9 (Test Report) and whether or not this Sked will transmit Expanded Test Report information. It does NOT have any bearing on Sked Function Codes 28 (Expanded Off-Normal Test Report) and 29 (Non-Expanded Off-Normal Test Report).
Yes: Report events listed in routing group test reports will report to the central station if they are off-normal.
No: Do not report off-normal conditions for the events listed in the routing group test reports at test time.
D5200 programming (7000, 9000, G, GV2, GV3 Firmware 8.05 and Lower)
1) Receive copy of the using the correct handler.
Note: For GV3 - Firmware 8.05 and Lower either RPS or D5200. GV3 Firmware 8.10 and higher is RPS only.
2) Enter group PANEL WIDE PARAMETERS
3) Enter group Phone Parameters
4) Expand Test Rpt Yes/No
* Prompt can be changed with the SPACE bar
* Must press ENTER for each prompt entry
5) SEND LOAD to panel